with it we all wan't to live here all over again.
But before that, here is what is going to happen to our wharf for the next 3 months. The barge is loaded with gear and ready to start.
They told me that they lift each piles, water blast it, put a plastic sleeve around it, replace pile, then pump concrete down between plastic and wooden pile . Fortunately because it is one of the only two public wharves on the Island the bay does not have to pay for the repairs. Yay!!
I have also been restricted to walking lately because one narrow section of the road has so deeply rutted on one side of the road my car would bottom out on it if I tried to pass - see umbrella indicating depth - but I was assured that it is going to be fixed early next week - Yay again !!!
https://www.youtube.com/watch?v=ONPlqKU_bdM&feature=youtu.be
No comments:
Post a Comment